Due to deficiency of supplies of electricity and gas in Bangladesh, desired overall development is being interrupted. Electricity and gas development plant installation is a long term process. That's why to deal with this crisis and increase the usage of solar energy, bio-gas and effluent treatment plant, Green Banking credit program was launched.
upto 60 months
6%
For Solar PV Assembly Plant 8%
0.5% but not more than 2,00,000/-
0.5% but not more than 1,00,000/-
1. Collaterals Collection Required more than 70000 for loan limit.
2. Installed machinery/Plants/goods will be Hypothecated to Bank.
3. Post dated Cheque will have to be taken as per Schedule number.
4. 1 undated Cheque of total loan.
5. If loan limit less than 70000 then 1 guarantor must be requried.
Upto 20,00,00,000/-
1. must be adult Bangladeshi citizen.
2. Age must be between 18 to 60 years old.
3. Involved in renewable fuel and environment friendly financing sector.
4. Capable to give collaterals.
Contact nearest branch.
N.B. : Rate of interest is variable time to time by the Bank Interest Rate Principles.